I've also been working on some crewel embroidery. I was hoping I'd be finished with this pillow top last month but I'm only about 1/3 done at this point. It is greatly enjoyable even if I'm still not 100% happy with my long and short stitch. If you look at the yellow part of the flower on the bottom left (where I started) you'll see that I didn't even understand what the long and short stitch was. Initially I was thinking of ripping it out and re-doing that flower but decided against it. Because really what are the odds someone will be visiting me, pick up the pillow, and exclaim in horror that I did one of the flowers wrong???
I hope to have some colorwork socks (Robyn Gallimore's Winter Dreams Socks) to show you soon.